PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Block work at 1st floor Sally ports Facing West.jpg Block work at corridor 149 Facing South.jpg Installing black iron duct work at the 4th floor Facing South.jpg Installing sprinkler branches at the 4th floor Facing West.jpg Installing VAV boxes at the 3rd floor Facing East.jpg EPDM Roofing at the High Roof Facing East.jpg Installing EPDM at the High Roof Facing East.jpg Installing Waste and Vent piping at the 3rd floor bathrooms Facing South.jpg
Previous pageNext page Installing VAV boxes at the 3rd floor Facing East
Installing VAV boxes at the 3rd floor Facing East